Cutter Suction Dredger 500 "25 January"

In 2012 Canal Naval Constructions Co (CNC) of Port Fouad, Egypt, built a CSD500 using Damen drawings and a prefabricated shipbuilding kit containing all the vital components including the dredge pump, the control cabin etc. The kit also included a large number of optional items such as a jib crane, navigation lights, a communications package, air conditioning, a bilge pump, heavier fenders, a fire fighting installation and a 500 litre fresh water tank with tap and sink. The dredger received Bureau Veritas class approval.

For its owner, the General Authority for Fish Resources Development, the ‘25 January’ is its second Damen dredger. Both operate on the northern Egyptian lakes of Manzala, Burullus and Bardawil.

View the CSD 500 Virtual Tour
built a CSD500 using Damen drawings and a prefabricated shipbuilding kit containing all the vital components including the dredge pump, the control cabin

Contact

Whether it's a simple question or you need assistance with your Damen product, we believe great things can start with a small conversation.

I'm interested in...