ASD Tugs 2913 "Arcangel San Rafael" and "Arcangel San Gabriel" The Meyer’s Group had ordered two, powerful ASD 2913 tugs to operate in the newly expanded Panama Canal. The first vessel, Arcangel San Rafael was delivered in May and the second vessel, Arcangel San Gabriel was delivered in June 2017. These new tugs fulfill the requirements of the Panama Canal Authority as more powerful vessels, of at least 80 tonnes bollard pull, are needed given the ever-increasing size of vessels. Download Product SheetSee all deliveries