Confined spaces are the right challenge for the DOP250.

The German city of Hamburg is working on its public transport infrastructure. The expanding city’s underground network, or “U-bahn” as called in German, required the construction of a tunnel. The tunnel site consists of sheet piles at either sides with heavy steel beams at regular intervals. This construction results in a very small operating area. The solution to the required bed leveling was using a DOP Submersible Dredge Pump 250. The 195 kW hydraulically driven DOP250 was attached to a crane, running on it’s hydraulic power.